|
The Production line of the assembly it is the pipelining work |
|
|
|
|
The vestibular of the undusty workshop, which is full-closed to prevent any dust the floor is brushed by paint to prevent the dust. |
|
|
|
|
The inside of the undusty workshop the operator must wear the undusty clothes to prevent the dust |
|
|
|
|
The workshop of the mold Dept they charge of the mold polishing, repairing and the mold make. |
|
|
|
|
The workshop of the injection,the semi-finished articles were be put aside the machine temporary. |
|
|
|
|
Another production line for the assembly the front board is the product of this production line |
|
|
|
|
The office of the Quality Dept their responsibility is reject the defective product, to ensure the products ship to the Customer is accept. |
|
|
|
|
The new workshop of the Injection we have the injection machine 30 sets the environment of the workshop is clean and ventilated. |
|
|
|