The production line of the assembly in pipelining work. |
|
|
|
|
The vestibular of the dust-free workshop which is fully-closed and the floor is waxed to prevent from the dust. |
|
|
|
|
The dust-free workshop, the operator must wear the undustry clothes to prevent from the dust. |
|
|
|
|
The tool shop is for mold polishing, maintaining , repairing and the mold making. Assembly lines |
|
|
|
|
The injection workshop, all the semi-finished products would be placed aside the machine temporary. |
|
|
|
|
The white board in front of the assembly line is for recording the daily assembled unit quantity. |
|
|
|
|
The Quality Dept. is to reject the defective quality products to ensure the products ship to the customers are in good conditions. |
|
|
|
|
There are 45 sets of injection machines placed in the clean and ventilated environment. |
|
|
|